Stormwater Division
The following forms may be downloaded, completed and return in person to the Public Works Department with all the necessary information as noted. Please refer to the links below for the forms and documents contained in this section.
- Project Types
- Detailed Plan Review Process
- Schedule of Fees
Applications
- Application for Detailed Sediment and SWM Plan Approval
- Application for Construction Improvement Plan (CIP) Approval
- Application for Fire Flow Test
- Certified Construction Reviewer (CCR) Application
Applications for Standard Plan Approval
- Residential Less Than 1.0 Acre
- Residential Greater Than 1.0 Acre
- Non-Residential Less than 1.0 Acre
- Minor Linear Utility Disturbances
- Stormwater Facility Maintenance
- Agricultural Structure Construction
- Demolition
- BMP Construction And Retrofit
- Minor Bridge and Culvert Construction
- Sidewalk, Trail, or Other Linear Impervious Surfaces
Plan Checklists
As-Built Checklists
- Stormwater As-Built Submission Checklist
- General Site and Utility As-built Checklist